CMD Group is a ConstructConnect® company. Learn more


Courthouse Alts: Moose Jaw Courthouse Ceiling Repair

Back to sample leads for Saskatchewan  |  Browse all Saskatchewan post-bid projects

64 Ominica Street W,Moose Jaw,SK

Location:

Moose Jaw, SK

Status:

Award,

Value:

$ 3,800,000.00

Categories

Single FamilyCourthouses

Notes:

Architectural Conservation Alliance is a joint-venture partnership between P3 Architecture and Jonathan Yardley Architect Inc.

Contract Conditions:

The project has an estimated construction cost ranging from $3,500,000 to $4,000,000. All inquiries with respect to this request should be directed to: Michael Toews, tel: 306-787-4468; fax: 306-798-0043; email: michael.toews@gov.sk.ca OR Angelica Redman,

Scope:

Defence, law enforcement bldgs; alterations to the Moose Jaw Court House to repair a collapsed ceiling. The second floor fire suppression system was attached to the collapsed ceiling which caused water damage to the basement, main and second levels of the

Project participants:

Name Role Contact details
PCL Construction Mgmt Inc Construction Manager(available with subscription)
Alfa Engineering LtdElectrical Engineer (available with subscription)
MacPherson Engineering IncMechanical Engineer (available with subscription)
Arch Conservation AllianceArchitect (available with subscription)
Brownlee Beaton KrekeStructural Engineer (available with subscription)
Sask Min of Central ServicesOwner (available with subscription)
PCL Construction Mgmt IncConstruction Manager (available with subscription)