Hydroelectric Generating Station: Jimmie Creek Power Plant - Phase 2 Upper Toba Valley

Back to sample leads for British-Columbia  |  Browse all British-Columbia post-bid projects

250 metres upstream from Jimmie Creek,Powell River,BC

Location:

Powell River, BC

Status:

Negotiated/Start,

Value:

$ 305,000,000.00

Categories

Power Plants and Lines

Notes:

Budget is the total capital cost; a construction budget has not been released. Website: www.alterrapower.ca. Plutonic Upper Toba Holdings Inc is a subsidiary of Alterra Power Corp.

Status:

The engineering/procurement/construction management (EPCM) contract has been awarded. Site work is currently underway. The project is to be in-service by July 2016. Direct enquiries to the construction manager.

Scope:

Elect power, building,Elect power, engineering; Construction of a new 124 MW hydroelectric run-of-river power project; will tie-in to the existing Toba Montrose facility & transmission line (30 Km S of Powell River). reinforced concrete foundation; CMU b

Project participants:

Name Role Contact details
SNC-Lavalin IncDesigner (available with subscription)
SNC-Lavalin IncConstruction Manager (available with subscription)
Knight Piesold ConsultingWater Feature Designer (available with subscription)
Knight Piesold ConsultingConsultant (available with subscription)
Alterra Power CorpOwner (available with subscription)
Plutonic Upper Toba Hldgs IncGeneral Contractor (available with subscription)