Subbid/Pkg:
Work Include:Site clearing, earthwork, site utilities for water, sanitary and storm sewer; roadwork and parking lot, demolition, concrete sidewalks and curbs, concrete footings,foundations and slabs, reinforced concrete garage structures, rough and trim cScope:
ApartmentsConcrete Slab On Grade Foundation,Wood Structural Frame New Construction of five (5) 3-Story Wood-Framed Sab-on-Grade Apartment Buildings, two (2) 3-Story Wood framed Apartments over 1-Story Garage Buildings, and Rehabilitation of two (2)Single Notes:
1. Pre-Bid Conference 10/23/2014 2:00 PMDetails:
[Division 2]: Building Demolition, Clearing, Earthwork, Grading, Paving & Surfacing, Water Systems, Sewerage & Drainage, Landscaping. [Division 3]: Concrete Formwork, Concrete Reinforcement, Structural Concrete, Structural Precast Concrete, Cementitious D