CMD Group is a ConstructConnect® company. Learn more



Various Locations,Antioch,CA

Location:

Antioch, CA

Status:

Low Bids Announced, BIDS: 09/16/2014, 03:00 PM

Value:

$ 452,500.00

Categories

Water and Sewage Treatment PlantsSewers and Water Mains

Scope:

Water Piping Piping Reconfiguration of Canal Pumps 2 and 4 and Pump 2 Replacement - The Capital Improvement Project Consists, in general, of furnishing all permits, material, labor, tools, supplies, equipment, transportation and superintendence necessary

Notes:

1. Mandatory Pre-Bid Conference Location = Canal East Pumping Station located at 3960 Lone Tree Way, across from Sutter Delta Hospital in Antioch, California 2. 8 Bids Received

Details:

[Division 2]: Slope Protection & Erosion Control, Paving & Surfacing. [Division 5]: Metal Fabrications. [Division 9]: Painting. [Division 11]: Water Supply/Treatment Equipment, Fluid Waste Treatment/Disposal Equipment.

Contract Conditions:

Mandatory Pre-Bid Conference 09/02/2014 2:00 PM

Project participants:

Name Role Contact details
Con-Quest Construction Inc General Contractor(available with subscription)
CA Pipe Fabricators General Contractor(available with subscription)
JMB Construction General Contractor(available with subscription)
Pacific Infrastructure Corporation General Contractor(available with subscription)
WM Lyles Co General Contractor(available with subscription)
J&M Inc General Contractor(available with subscription)
Valentine Corp General Contractor(available with subscription)
RJ Gordon Const Inc General Contractor(available with subscription)
Clyde G Steagall Inc General Contractor(available with subscription)
West Bay Builders Inc General Contractor(available with subscription)
BPXpress ReprographicsPlans Representative (available with subscription)
Antioch-City ClerkOwner (available with subscription)
Brown & CaldwellCivil Engineer (available with subscription)