CMD Group is a ConstructConnect® company. Learn more


Orlando International Airport V 696 Landside Levels 2 & 3

Back to sample leads for Florida  |  Browse all Florida post-bid projects

9456 Jeff Fuqua Blvd,Orlando,FL

Location:

Orlando, FL

Status:

Postbids Unavailable,

Value:

$ 2,600,000.00

Categories

Transportation Terminals

Scope:

Transportation Terminal ORLANDO INTERNATIONAL AIRPORT V 696 LANDSIDE LEVELS 2 & 3 REHABILITATION

Notes:

1. 16% Set Aside For MBE & WBE 2. 12% Set Aside For LDB

Details:

[Division 2]: Building Demolition, Fences & Gates. [Division 4]: Glass Block Masonry. [Division 5]: Structural Steel, Cold Formed Metal Framing, Metal Fabrications, Metal Railings. [Division 6]: Rough Carpentry. [Division 7]: Insulation, Fireproofing. [Di

Contract Conditions:

Invited Bidders Only

Project participants:

Name Role Contact details
Clancy & Theys Construction Company General Contractor(available with subscription)
Hughes Associates Inc FireFire Protection (available with subscription)
C T Hsu & Associates PAArchitect (available with subscription)
Milan EngineeringPlumbing Engineer (available with subscription)
Milan EngineeringMechanical Engineer (available with subscription)
MLM Martin Architects IncArchitect (available with subscription)
Greater Orlando Aviation Authority Construction (Bids)Owner (available with subscription)
Matern Professional Engineering IncElectrical Engineer (available with subscription)