CMD Group is a ConstructConnect® company. Learn more


Lifecare Hospitals Transitional Care Unit Main Campus

Back to sample leads for Pennsylvania  |  Browse all Pennsylvania post-bid projects

100 S Jackson Ave,Pittsburgh,PA

Location:

Pittsburgh, PA

Status:

Postbids Unavailable,

Value:

$ 700,000.00

Categories

Hospitals, Clinics

Notes:

1. Mandatory Pre-Bid Conference Location = Main Lobby, LifeCare Hospitals of Pittsburgh Main Campus225 Penn AvenuePittsburgh, PA 15221 2. Plan Deposit Checks Must Be Payable To VEBH Architects, P.C 3. Architect Contact E-Mail: info@vebh.com 4. Invited Bid

Details:

[Division 2]: Building Demolition, Water Systems, Sewerage & Drainage. [Division 5]: Structural Steel, Metal Fabrications. [Division 6]: Architectural Woodwork. [Division 8]: Metal Doors, Hardware, Glass & Glazing. [Division 9]: Drywall/Gypsum, Tile, Acou

Contract Conditions:

Mandatory Pre-Bid Conference 06/04/2014 3:00 PM

Project participants:

Name Role Contact details
Jendoco Construction Corporation General Contractor(available with subscription)
Pittsburgh LifeCare HospitalsOwner (available with subscription)
Hornfeck EngineersElectrical Engineer (available with subscription)
VEBH Architects (Valentour English Bodnar & Howell)Architect (available with subscription)
Tower EngineeringMechanical Engineer (available with subscription)