CMD Group is a ConstructConnect® company. Learn more



378 Main St,Shrewsbury,MA

Location:

Shrewsbury, MA

Status:

General Contractor Award, BIDS: 05/08/2014, 02:00 PM

Value:

$ 10,488,000.00

Categories

Junior High Schools

Scope:

This project is the construction of a new Arts & Academics Center for Saint John's High School located at 378 Main Street in Shrewsbury, MA. The building is 3-stories containing 45,000 sf. The structure is structural steel framed, prefabricated wood roof

Notes:

1. F.W. Madigan bid due: 05/07/14 @ 2:00pmContact: David Adams @ 508-753-1459 / estimating@fwmadigan.com

Details:

[Division 2]: Clearing, Earthwork, Grading, Slope Protection & Erosion Control, Paving & Surfacing, Water Systems, Sewerage & Drainage, Electric Power Transmission, Irrigation, Fences & Gates, Landscaping. [Division 3]: Concrete Formwork, Architectural Co

Project participants:

Name Role Contact details
FW Madigan Company, Inc. General Contractor(available with subscription)
Lauring Constr Co Inc General Contractor(available with subscription)
Cutler Associates General Contractor(available with subscription)
Saint Johns HighschoolOwner (available with subscription)
Cobalt DesingInterior Designer (available with subscription)
Cavanaugh Tocci AssociatesConsultant (available with subscription)
OReilly Talbot & Okum Associate IncorporationGeotechnical Consultant (available with subscription)
Waterman Design AssocCivil Engineer (available with subscription)
Johnson & Seaman Engrg IncStructural Engineer (available with subscription)
Lindgren-SharplesFire Protection (available with subscription)
Lindgren-SharplesMechanical Engineer (available with subscription)
Juster Pope FrazierArchitect (available with subscription)
Lauring Constr Co IncGeneral Contractor (available with subscription)
Shepherd EngrgElectrical Engineer (available with subscription)