Municipal Water and Wastewater Facility Project Case Study in Nevada

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of municipal water and wastewater facility projects in Nevada are also available.

Project Overview

Project Title:BERMUDA 2538 ZONE PUMP STATION
Estimated Value:$10,909,000
The cost to build municipal water and wastewater facilities in Nevada depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Nevada
County:Clark
City:Las Vegas
Address:325 E Bruner Ave

Project Type

Building Category:Municipal Water and Wastewater Facilities
Work Type:New

Project Description:

Water Treatment P25 MGD Pump Station With Three Equally Sized 5,800 GPM Constant Speed Pumping Units And One Spare Unit On A 24 Hour Per Day Basis With A Total Dynamic head O 143 Feet, Provisions For Two Additional Pumps In The Future, Pump Building, Overhead Bridge Crane, Surge Arrestor Assembly, Pumps, Piping, Metering And Control, Valves, Electrical And Telemtry Equipment, Sumps, HVAC Equipment, Restroom Facilities, Site Work, Install Two Solarbee Mixers, Off Site Pipeline Connection, Offsite Nevada Power Co And Sprint Facilities