Municipal Water and Wastewater Facility Project Case Study in Nebraska

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of municipal water and wastewater facility projects in Nebraska are also available.

Project Overview

Project Title:BENNET WASTEWATER TREATMENT PLANT
Estimated Value:$1,353,120
The cost to build municipal water and wastewater facilities in Nebraska depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Nebraska
County:Lancaster
City:Bennet
Address:Hwy 43 & Hwy 2

Project Type

Building Category:Municipal Water and Wastewater Facilities
Work Type:New

Project Description:

Sewage Treatment Modifications To Existing Facilities; A)Replace Existing Lift Station Pumps (2) & Suction Pipes, Connect UV Discharge Into Existing Outfall Manhole; B)Construction Of New Facilities-Water Main Pipe, New Gravel Access Roadway To The Proposed WWTF Site & Extend Required Utilities Including Water, Electric, Telephone & Wastewater Force Main, Construct New Headworks Structure Consisting Of Flow Meter Pit, Mechanical Line Screen & A Manually Cleaned Bypass Bar Rack; Construct Wastewater Treatment Aeration, Clarifier & Digester Tankage & Install All Equipemnt (Aero-Mod Process), Construct UV Disinfection Structure, Install All Yard Piping & Make Necessary Connections; Construct New Masonry Control Building & Provide Specified Furniture & Equipment; Put All Equipment Into Service & Conduct Startup Of The Facility As Specified