CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Missouri construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$18,186,318,014
Bid Phase:$226,516,085
Post-Bid:$58,818,274,713
Civil Projects (value)
Pre-Bid Phase:$1,422,502,887
Bid Phase:$161,811,503
Post-Bid:$25,027,696,042



Municipal Water and Wastewater Facility Project Case Study in Missouri

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of municipal water and wastewater facility projects in Missouri are also available.

Project Overview

Project Title:CREVE COEUR PUMP STATION
Estimated Value:$17,930,000
The cost to build municipal water and wastewater facilities in Missouri depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Missouri
County:St. Louis
City:Creve Coeur
Address:Creve Coeur Mill Rd

Project Type

Building Category:Municipal Water and Wastewater Facilities
Work Type:New

Project Description:

Sewage Piping, Sewage Treatment New L 52 Pump Station To Include: 60 MGD Pump Station With Five 15 MGD Dry-Pit Centrifugal Pumps; Pump Station Will Also Include Two Channel Grinders In The Headworks, An Odor Control System, An Emergency Generator, A Meter Vault, And Gravity & Force Main Piping; Includes Demolition Of The Existing Pump Station Facilities That Consists Of The Original Pump Station (Currently Abandoned), Th Current Pump Station, The Electrical & Control Building, & The Emergency Generator Underground Storage Tank