Municipal Water and Wastewater Facility Project Case Study in Maryland

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of municipal water and wastewater facility projects in Maryland are also available.

Project Overview

Project Title:BACK RIVER WWTP BLOWER BUILDING
Estimated Value:Not Available (develop your own cost estimate with RSMeans Online)
The cost to build municipal water and wastewater facilities in Maryland depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Maryland
County:Baltimore City
City:Baltimore
Address:Back River

Project Type

Building Category:Municipal Water and Wastewater Facilities
Work Type:New

Project Description:

Sewage Treatment Improvements To Gas Booster Room, Replace existing Instrumentation On Each Blower Skid/On Blower Suction, Bypass & Discharing Piping, Replace Exisitng Control Panel For Each Blower Provide A New master Blower Control Panel, Replac Exisitng Motor Starters For 1,500 HP Blower Motors With New Solid State Reduced Voltage Starters, Oil Cooling System Upgrade & Replace 30" Check valve Internal Assembly