CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Colorado construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$6,624,756,186
Bid Phase:$124,188,863
Post-Bid:$47,937,280,849
Civil Projects (value)
Pre-Bid Phase:$1,181,198,002
Bid Phase:$44,552,000
Post-Bid:$11,387,393,939



Municipal Water and Wastewater Facility Project Case Study in Colorado

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of municipal water and wastewater facility projects in Colorado are also available.

Project Overview

Project Title:BLACK SQUIRREL WWTP
Estimated Value:$15,246,900
The cost to build municipal water and wastewater facilities in Colorado depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Colorado
County:El Paso
Address:Drennan & Milne

Project Type

Building Category:Municipal Water and Wastewater Facilities
Work Type:New

Project Description:

Project Includes New Wastewater Treatment Facility Including: General Site Work, Operations Building, Electrical Building, Headworks Building, SBR Basins Nos 1 Through 4, Digester Building, Aerobic Disgester Basins Nos Through 3, Solids Handling Building With Day Tanks, Flow Equalization Basins, UV Disinfection & Effluent Flow Measurement Building, On-Site Non-Potable Water Distribution System Yard Piping, Valving, Water Hydrants & Yard Hydrants, Power Distribution System Including Exterior Power Distribution To: Electrical Building, Operation Building, Headworks Building; 4 SBR Basins; Digester Building; 3 Aerobic Digesters; Solids Handling Building; Equalization Basins; UV Disintection/Effluent Flow Monitoring Building; & Exterior Yard Lighting, Fiber Optics To Accommodate Instrumentation & Control Functions, Telephone Cable Installation, Pressurized & Gravity Flow Yard Piping, Manholdes, Valves & Appurtenances, 2000kW Standby Generator, Pad, Automatic Transfer Switch & Interconnectioni Conduit/Conductor, Potable Water Service Line Extension From Operations Building To Point Of Termination Near New Well Location