Water and Sewage Piping Project Case Study in New Jersey

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of water and sewage piping projects in New Jersey are also available.

Project Overview

Project Title:GLASSBORO TWO IRRIGATION WELLS
Estimated Value:$1,300,000
The cost to build water and sewage piping in New Jersey depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:New Jersey
County:Gloucester

Project Type

Building Category:Water and Sewage Piping
Work Type:New

Project Description:

Sewage Piping The Project Includes 1. Drilling And Development Of Two Irrigation Wells Within The Borough Of Glassboro At The East New Street Recreation Complex And The South Delsea Drive Recreation Complex As Indicated On The Plans. 2. Construction Of 6 Pvc Casing, Well Screen, Gravel Pack, Provide And Install 7.5 H.P. 3-Phase Submersible Pump, A Vfd, To Include A Pitless Adapter, All Piping, Fittings, Pressure Gauges, Flow Control Valve And Check Valve, Along With A New Meter Pit And Flow Meter, And All Associated Work Required To Properly Interconnect The New Irrigation Well Into The Existing Irrigation Main. 3. Construction Of All Electrical Components And Appurtenances Required For The Proper Operation Of The Irrigation Wells. 4. All Testing Associated With The Well Development And The Installation Of Pump Equipment As Dictated By The Specifications.