CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Kentucky construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$9,252,045,310
Bid Phase:$95,457,573
Post-Bid:$28,145,044,210
Civil Projects (value)
Pre-Bid Phase:$1,415,296,867
Bid Phase:$71,570,023
Post-Bid:$12,648,150,026



Vocational Training Center Project Case Study in Kentucky

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of vocational training center projects in Kentucky are also available.

Project Overview

Project Title:FRANKLIN SIMPSON TECHNICAL CENTER
Estimated Value:$8,998,000
The cost to build vocational training centers in Kentucky depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Kentucky
County:Simpson
City:Franklin
Address:175 Davis Dr

Project Type

Building Category:Vocational Training Centers
Work Type:New

Project Description:

Vocational Training, Community College Classroom[s], Laboratory, Library, Office[s], Restroom Cast In Place Concrete Foundation, Steel Joist Roof Structure, Metal Roof Deck Floor Finishes Include Vinyl Composition Tile, Carpet, And Ceramic Tile. Interior Walls Are Load-bearing C.M.U. And/Or Metal Studs With G.W.B. Wall Finishes Are Paint. Ceilings Are Suspended Acoustical Tile And Gypsum Wallboard An Elevator Is Included. Site Work Includes Grading, Utilities, New Roads, New Sidewalks, Landscaping, And Drainage.