CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Maine construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$2,123,676,095
Bid Phase:$16,259,900
Post-Bid:$7,881,152,139
Civil Projects (value)
Pre-Bid Phase:$72,985,700
Bid Phase:$32,050,000
Post-Bid:$3,188,768,273



Transportation Terminal Project Case Study in Maine

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of transportation terminal projects in Maine are also available.

Project Overview

Project Title:HILTON GARDEN INN HOTEL & CONFERENCE CTR
Start Date:2004-07-01
Estimated Value:$6,500,000
The cost to build transportation terminals in Maine depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Maine
County:Cumberland
City:Freeport
Address:Freeport Station, 5 &10 Park St

Project Type

Building Category:Transportation Terminals
Work Type:New

Project Description:

Hotels Guest Room[s], Laundry, Lobby, Maintenance, Meeting Room, Office[s], Restroom, Vehicle Parking Cast In Place Concrete Foundation, CMU Block Structural Frame, Brick Exterior, Wood Siding Exterior, Pre-Manufactured Wood Truss Roof Structure, Asphalt Shingle Roof, Membrane Roofing, Design Build Electrical System Hotel & 300-Seat Conference Center At Former Eastland Shoe Manufacturing Site (To Be Demolished); Historic Elements Of Adjoining Town Hall Building To Be Preserved & Integrated With New Hotel/Conference Center; Circular Driveway; Indoor Pool; Train Station To Be Built At Later Date