CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Utah construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$2,741,295,469
Bid Phase:$66,520,345
Post-Bid:$55,421,393,468
Civil Projects (value)
Pre-Bid Phase:$967,705,844
Bid Phase:$28,179,228
Post-Bid:$7,883,773,951



Tank Project Case Study in Utah

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of tank projects in Utah are also available.

Project Overview

Project Title:FLAT BOTTOM CANYON WELL
Estimated Value:$100,000
The cost to build tanks in Utah depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Utah
County:Box Elder
City:Brigham City
Address:100 North 1600 East

Project Type

Building Category:Tanks
Work Type:New

Project Description:

Drilling, Construction, Testing And Completion Of One Exploratory Well And One Production Well. The Exploratory Well Will Be 8" In Diameter With A Depth Of Approximately 900 Feet. The 8" Exploratory Well Shall Be Tested For Water Quantity And Quality. The Production Well Will Be Drilled To Accommodate Either 12 Or 16 Inches Diameter Casing, Formation Stabilizer Material, Development, Test Pumping, Sampling, And Other Associated Incidentals.