CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of North Dakota construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$2,150,008,248
Bid Phase:$21,500,000
Post-Bid:$4,997,222,709
Civil Projects (value)
Pre-Bid Phase:$550,010,211
Bid Phase:$3,701,000
Post-Bid:$5,149,268,681



Tank Project Case Study in North Dakota

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of tank projects in North Dakota are also available.

Project Overview

Project Title:MANDAN SOUTH SIDE RESERVOIR
Estimated Value:$3,099,800
The cost to build tanks in North Dakota depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:North Dakota
County:Morton

Project Type

Building Category:Tanks
Work Type:New

Project Description:

The Work Consists Of All Labor, Skill, And Materials Required To Properly Construct The South Side Reservoir. Major Components Of The Project Include: Contract 1 General Construction (Lump Sum): Mobilization, Bonding, And Insurance For All Project Work Shown On The Drawings Including: Site Work; Furnishing And Installing Large Concrete Vault, Manhole, Excavation, Borrow, And Fill To Install And Support A New 4.0 Million Gallon Reservoir With Integral 1.5 Million Gallon Interior Reservoir. New Reservoir Has Bidding Options For Roof Type And Height. Project Includes All Related Water Process Piping, Fittings, And Valves; Overflow And Drain Piping; Architectural Treatment Options; Finishes (Painting, Coatings); Asphalt Access Road, Fences, Seeding, Other Restoration And Erosion Control; And Miscellaneous Related Construction, Equipment, And Appurtenances. Also Included In The Project Is Retrofit Of The Existing Collins Avenue Reservoir Flow Control Vault And Site Piping Modifications. Contract 2 Electrical Construction (Lump Sum): Mobilization, Bonding, And Insurance For All Project Work Shown On The Electrical Drawings Including: Furnishing And Installing New Power To Reservoir Site And Electronic Equipment For Support And Communication To The New Reservoir. New Reservoir Equipment Includes New Incoming Feed Power, Transformer, Conduit, Wiring, Metering, Panels, Lighting, Pressure Transducer, Controls Cabinet, Floor Flood Sensors, Heater, Dehumidifier, And Radio Telemetry. Also Included In The Project Is New Control Wiring For A New General Contractor Supplied Flow Control Actuator Located In The Existing Collins Avenue Reservoir Vault. Contract 3 Combined Construction (Lump Sum): Mobilization, Bonding, And Insurance For All General Construction And Electrical Construction As Described In Contracts 1 And 2.