Tank Project Case Study in Georgia

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of tank projects in Georgia are also available.

Project Overview

Project Title:MOODY AFB ELEVATED WATER TANK
Estimated Value:$1,300,000
The cost to build tanks in Georgia depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Georgia
County:Lowndes

Project Type

Building Category:Tanks
Work Type:New

Project Description:

Tank[s] The Work To Be Done Shall Consist Of Furnishing All Labor,Materials And Equipment Necessary To Complete The Project Titled Moody AFB Elevated Water Tank Relocation As Shown On The Construction Drawings. In General, Relocation Consists Of Dismantling, Transporting, Re-Erection, Painting And Foundations Of A 100,000 Gallon Spherical Elevated Water Tank From Moody AFB.The Furnishing Of All Materials And Labor Necessary To Perform The Relocation Of The Existing 100,000 Gallon Elevated Single Pedestal Water Storage Tank And Appurtenances, Which Includes Testing, Paint Restoration, Foundations, And All Other Necessary Work For A Fully Functional Tank.