CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Nevada construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$5,656,352,418
Bid Phase:$14,125,000
Post-Bid:$35,571,957,157
Civil Projects (value)
Pre-Bid Phase:$1,728,563,401
Bid Phase:$8,939,750
Post-Bid:$8,452,091,101



Swimming Pool Project Case Study in Nevada

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of swimming pool projects in Nevada are also available.

Project Overview

Project Title:HERITAGE PARK SENIOR & AQUATIC FACILITY
Estimated Value:$26,123,900
The cost to build swimming pools in Nevada depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Nevada
County:Clark
Address:Burkeholder Blvd & Racetrack Rd

Project Type

Building Category:Swimming Pools
Work Type:New

Project Description:

Clubs, Community Center, Park Building Activity, Food Preparation, Food Storage, Gaming, Gathering, Office[s], Records Storage, Recreation, Restroom, Swimming Pool Concrete Foundation, Structural Steel Frame, EIFS Exterior , Masonry Exterior , Stucco Exterior, Steel Joist Roof Structure, Steel Bar Joist Roof Deck , Membrane Roofing Phase A- Senior Facility Which Includes Site Clearing, Earthwork, Site Improvements, Concrete, Masonry, EIFS, Gabion Walls, Flag Poles, Site Furnishings, Structural Steel Long Span Steel Joists, Steel Decking, Steel Stud Framing, Metal Fabrications, Rough Carpentry, Architectural Woodwork, Waterproofing, Stucco, Insulation, Sheet Metal Roofing, Modified Bitumen Roofing, Roof Accessories, Sheet Metal Steel Doors & Frames, Wood Doors, Aluminum Entrances, Hardware, Glazing, Aluminum Curtainwall, Interior Finishes, Restroom Specialties, Food Service Equipment, Specialty Equipment, Acoustical Ceilings, Wood & Resilient Flooring, Carpet, Signage, Plumbing, Fire Protection Heating/Ventilation/Air Conditioning, Electrical Systems, Lighting & Communications & Alarm Signal Systems. Phase B- Aquatic Facility Which Includes Site Clearing, Earthwork, Site Improvements, Concrete, Masonry, EIFS, Gabion Walls, Flag Poles, Site Furnishings, Swimming/Diving Pools & Equipment, Structural Steel, Long Span Steel Joists, Stell Decking, Steel Stud Framing, Rough Carpentry, Metal Fabrications, Architectural Woodwork, Locker Room & Restroom Specialties, Waterproofing, Insulation, Insulated Membrane Roofing, Roof Accessories, Sheet Metal, Steel Doors & Frames, Wood Doors, Signage, Aluminum Entrances, Aluminum Windows, Hardware, Glazing, Aluminum Curtainwall, Interior Finishes & Furnishings, Specialty Equipment, Plumbing, Fire Protection, Heating/Ventilating/Air Conditioning, Pool Water Systems, Electrical Systems, Lighting & Communications, Alarm Signal Systems, & Telecommunication & Data Technology.