CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Maine construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$2,123,676,095
Bid Phase:$16,259,900
Post-Bid:$7,881,152,139
Civil Projects (value)
Pre-Bid Phase:$72,985,700
Bid Phase:$32,050,000
Post-Bid:$3,188,768,273



Sitework Project Case Study in Maine

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of sitework projects in Maine are also available.

Project Overview

Project Title:ASHLAND PREK-12 SCHOOL SITEWORK PH 1
Estimated Value:$305,000
The cost to build sitework in Maine depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Maine
County:Aroostook
Address:Oak St

Project Type

Building Category:Sitework
Work Type:New

Project Description:

Sitework Preparatory sitework for the new Ashland PreK- 12 School that will be a two-story steel frame building of approximately 63,000 sf first floor and 29,000 sf second floor. The building and finish sitework will be bid separately as Phase II in Fall 2008. Phase I site Prep includes rough grading approximately half the site to 6 below final Phase II finish grade. The other half of the site will remain in use as a Middle and High School during Phase I and Phase II construction of the new school. Phase I Site Prep also includes removal of approximately 9,000 cubic yards of existing fill under the footprint of the proposed new building, and replacement of the existing fill with new compacted structural fill. The compaction testing firm engaged by the Phase I contractor to conduct compaction tests may also be engaged by the Owner to determine onsite the extent of existing fill to be removed. The Phase I contractor shall carry removal and replacement of 9000 cubic yards of existing fill in their base bid.