CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Nevada construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$5,656,352,418
Bid Phase:$14,125,000
Post-Bid:$35,571,957,157
Civil Projects (value)
Pre-Bid Phase:$1,728,563,401
Bid Phase:$8,939,750
Post-Bid:$8,452,091,101



Sidewalk, Curb & Gutter Project Case Study in Nevada

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of sidewalk, curb & gutter projects in Nevada are also available.

Project Overview

Project Title:NDOT SR 28 EROSION CONTROL CONST
Start Date:2004-07-01
Estimated Value:$4,661,990
The cost to build sidewalks, curbs & gutters in Nevada depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Nevada
County:Washoe
Address:SR 28 Tahoe Blvd From Lakeshore Blvd

Project Type

Building Category:Sidewalks, Curbs & Gutters, Flood Control, Roads
Work Type:New

Project Description:

Road[s], Sidewalk[s], Curb[s], Gutter[s], Flood Control 402 0660 8,356 PLANTMIXING MISCELLANEOUS SQYD AREAS 402 0676 1,897 PLANTMIX BITUMINOUS SHOULDER LINFT DIKES 402 6000 2,186 PLANTMIX SURFACING (TYPE 2) (WET TON 405 0516 5.13 EMULSIFIED ASPHALT, TYPE SS-1H TON (DILUTED) 502 0808 80 12-FOOT X 7-FOOT PRECAST LINFT CONCRETE BOX CULVERT 609 0504 18,295 STRUCTURAL STEEL GRATES POUND 610 0505 4,170 RIPRAP (CLASS 550) CUYD 624 0004 7,100 FLAGGE HOUR