CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of California construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$202,631,432,920
Bid Phase:$5,205,384,871
Post-Bid:$384,942,067,110
Civil Projects (value)
Pre-Bid Phase:$19,895,204,396
Bid Phase:$1,751,408,695
Post-Bid:$95,489,603,204



Sidewalk, Curb & Gutter Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of sidewalk, curb & gutter projects in California are also available.

Project Overview

Project Title:AV CHILDRENS CENTER PARK-N- RIDE
Estimated Value:$380,000
The cost to build water and sewage piping in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:Los Angeles
City:Lancaster

Project Type

Building Category:Water and Sewage Piping, Sidewalks, Curbs & Gutters
Work Type:New

Project Description:

Sidewalk[s], Curb[s], Gutter[s], Water Treatment, Water Piping, Sewage Piping, Sewage Treatment Work Includes: Construction Of Curb, Gutter, Base, AC Pavement, Drive Approaches, And Parkway Drains, A Water Line, Fire Hydrant And Sewer Connection A Storm Water Treatment Unit, Including Connection To Existing 12" Outlet Pipe, Installation Of Parking Lot Striping And Signage, Installation Of Parking Lot Lighting, Installation Of Irrigation, Planting And Rocks, Contruction Of Water Line And Sewer Connection