CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Alabama construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$6,995,400,266
Bid Phase:$157,488,500
Post-Bid:$29,153,690,270
Civil Projects (value)
Pre-Bid Phase:$1,978,062,339
Bid Phase:$73,287,665
Post-Bid:$9,142,107,127



High School Project Case Study in Alabama

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of high school projects in Alabama are also available.

Project Overview

Project Title:ENTERPRISE HI SCHL & ATHLETIC FAC PROJ B
Estimated Value:$83,984,000
The cost to build high schools in Alabama depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Alabama
County:Coffee
Address:Boll Weevil Circle

Project Type

Building Category:High Schools
Work Type:New

Project Description:

Gym & Athletic Building, Senior High School Administrative, Athletic Courts, Athletic Training, Band Room, Basketball Court, Cafeteria, Classroom[s], Cold Storage, Dressing/Changing, Food Preparation, Food Storage, Gymnasium, Indoor Rifle Range, Kitchen, Library, Locker Room, Media Center, Office[s], Restroom, Science Room, Storage Concrete Foundation, Structural Steel Frame, Brick Exterior, Other Exterior Wall, Split Face CMU Exterior, Pre-Manufactured Wood Truss Roof Structure, Steel Joist Roof Structure, Asphalt Shingle Roof, Standing Seam Metal Roof, Membrane Roofing, Chilled Water Cooling System, Steam/Hot Water Heating System Field House Concrete Foundation, Pre-Engineered Metal Frame, Standing Seam Metal Roof 2 Storm Shelters Within School Building, 1 Storm Shelter In Field House Steel Reinforced CMU Walls, FEMA Rated Steel Doors