CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Oklahoma construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$4,987,559,808
Bid Phase:$165,835,823
Post-Bid:$22,783,383,714
Civil Projects (value)
Pre-Bid Phase:$4,241,625,802
Bid Phase:$60,490,000
Post-Bid:$11,414,612,170



School Auditorium Project Case Study in Oklahoma

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of school auditorium projects in Oklahoma are also available.

Project Overview

Project Title:ATOKA CAFETORIUM
Estimated Value:$2,553,000
The cost to build school auditoriums in Oklahoma depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Oklahoma
County:Atoka
City:Atoka
Address:800 Greathouse Dr

Project Type

Building Category:School Auditoriums
Work Type:New

Project Description:

School Auditorium, Cafeteria Building Include Earthworth, Site Utilites, Paving, Curb & Gutters, Pier & Grad Beam Foundation, Pre- Engineered Metal Building Structure, Pre-Finsihed Metal Wall & Roof Panel, Brick Veneer, Structual Steel, Steel Joists, Concrete On Metal Deck, CMU Partitions, Hollow Metal Door & Frames, Hollow Metal Windows, Suspended Acoustical Ceilings, CabinetWork, Carpet, Ceramic Tile, Rubber Tile, Painting, Resinous Flooring, stained Concrete, Insulation , Specialties, Stage Equipment, Food Service Equipment, Wheelchair Lift, Fire Protection System, HVAC, Plumbing, Electrical & Lighting Systems