Total value of Wyoming construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$1,614,522,911
Bid Phase:$14,700,000
Post-Bid:$5,539,078,055
Civil Projects (value)
Pre-Bid Phase:$406,240,689
Bid Phase:$9,932,500
Post-Bid:$4,872,950,601



Road Project Case Study in Wyoming

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of road projects in Wyoming are also available.

Project Overview

Project Title:WYDOT P ST ROAD WORK
Estimated Value:$531,182
The cost to build roads in Wyoming depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Wyoming
County:Goshen
City:Torrington
Address:P St

Project Type

Building Category:Roads
Work Type:New

Project Description:

Road[s], Sidewalk[s], Curb[s], Gutter[s], Excavating & Grading, Fencing, Miscellaneous Civil, Sewage Piping 103.05000 PERFORMANCE BOND LUMP LUMP 106.05200 CONTRACTOR TESTING LUMP LUMP 109.04000 FORCE ACCOUNT WORK 8,500.000 109.08000 MOBILIZATION LUMP LUMP 202.03100 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LUMP LUMP 202.03250 REMOVAL OF RC BOX CULVERTS (44.0 FT) LUMP LUMP 202.03260 REMOVAL OF PIPE 330.000 FT 202.03430 REMOVAL OF SIDEWALK 11.000 SY 202.03445 REMOVAL OF CURB AND GUTTER 20.000 FT 202.03460 REMOVAL OF CONCRETE LUMP LUMP 203.02500 UNCLASSIFIED EXCAVATION 5,350.000 CY 207.03100 TOPSOIL STORING 3,650.000 CY 207.03200 TOPSOI PLACING 3,650.000 CY 209.01000 WATER 255.000 MG 210.03300 MOTOR GRADER 40.000 H 215.01000 CONTRACTOR STORM WATER CONTROL LUMP LUMP 216.03100 SEEDING (PLS) 39.000 LB 216.03120 FERTILIZER TYPE I 97.000 LB 216.03600 HYDRAULIC MULCHING 3.000 TON 301.01085 CRUSHED BASE 2,515.000 CY 401.02000 HOT PLANT MIX 3,150.000 TON 401.02055 HOT PLANT MIX APPROACHES 118.000 TON 401.03322 ASPHALT BINDER (PG 64-28) 198.000 TON 407.01000 TACK COAT 2.000 TON 408.01000 PRIME COAT 21.000 TO 413.01000 HYDRATED LIME 31.000 TON 603.01024 PIPE 24 in 25.000 FT 603.03024 PIP FE SECT 24 in 1.000 EA 603.20048 RCP 48 in 106.000 FT 603.71010 PIPE COLLARS 2.000 CY 607.20500 FENCE TYPE E (WOOD POSTS) 2,175.000 FT 607.71300 GATES RAIL 16 FT 1.000 EA