CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Wisconsin construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$10,097,853,409
Bid Phase:$176,466,500
Post-Bid:$26,777,423,454
Civil Projects (value)
Pre-Bid Phase:$1,649,392,840
Bid Phase:$160,075,798
Post-Bid:$14,615,187,690



Road Project Case Study in Wisconsin

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of road projects in Wisconsin are also available.

Project Overview

Project Title:CITY OF MILWAUKEE PAVING
Estimated Value:$162,314
The cost to build roads in Wisconsin depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Wisconsin
County:Milwaukee

Project Type

Building Category:Roads
Work Type:New

Project Description:

Road[s] Construction Of Vt Asphalt Pavement, Concrete Curb And Gutter, Walk, Sodding; Etc - South Barclay Street - East Pittsburgh Avenue To South Water Street/East Seeboth Street; South Shore Drive - East Ontario Street To East Russell Avenue; North 24th Street - West Center Street To West Hadley Street. Bid Security Required: Bond, Certified Check, Cashier's Check, Or Cash To Accompany Bid: 10% Of Contractor's Base Bid Time For Completion: 22 Working Days. South Barclay Street Consists Of Two (2) Stages. Stage I Includes All Work, Except For The Placement Of The Top One And One-Half Inches (1 1/2 ) Of Asphalt Surface Course. Stage I Shall Be Completed By September 19, 2008. Stage Ii Includes Manhole Adjustment Rings And The Top One And One Half Inches (1 1/2 ) Of Asphalt Surface Course. Stage Ii Shall Be Done In The Following Year And Completed By June 30, 2009.