CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Arkansas construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$3,353,830,818
Bid Phase:$50,800,868
Post-Bid:$16,862,124,922
Civil Projects (value)
Pre-Bid Phase:$1,011,717,507
Bid Phase:$66,588,000
Post-Bid:$8,684,147,478



Road Project Case Study in Arkansas

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of road projects in Arkansas are also available.

Project Overview

Project Title:ARDOT HIGHWAY 100 LANE OVERPASS
Estimated Value:$6,076,580
The cost to build roads in Missouri depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Missouri
County:Pulaski
City:Crocker
Address:Hwy 100

Project Type

Building Category:Roads
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Sidewalk[s], Curb[s], Gutter[s], Water Piping, Excavating & Grading, Miscellaneous Civil, Flood Control, Sewage Piping THIS PROJECT IS TO CONSTRUCT A 5 LANE OVERPASS FOR HWY. 100 OVER I-40 IN NORTH LITTLE ROCK. THIS PROJECT CONSISTS OF GRADING,MINOR DRAINAGE STRUCTURES,AGGREGATE BASE COURSE,ACHM BINDER AND SURFACE COURSES,ONE CONTINUOUS COMPOSITE PLATE GIRDER BRIDGE(TOTAL SPAN LENGTH 447.08'),CONCRETE COMBINATION CURB AND GUTTER,SIDEWALKS,EROSION CONTROL ITEMS AND MISC. ITEMS. ROUTES:100&40 SECTIONS:0&33 COUNTY:PULASKI LENGTH:0.208000 THE FOLLOWING ITEMS AND APPROXIMAT QUANTITIES ARE INVOLVED:202038 R&D OF CONC.PARAPET WALL 2.000 EACH 202039 R&D O PIER PROTECTION 144.000 LF 202046 R&D OF ISLANDS 76.000 SQYD 202052 R&D OF APPROACH GUTTERS 2.000 EACH 202096 R&D OF PIPE CULVERTS 2.000 EACH 202132 R&D O GUARDRAIL 1210.000 LF 205011 REMV.EXIST.BR.STR.(SITE 1)1.000 L.S. 210201 UNCLASSIFIED EXCAVATION 15872.000 CUYD 210601 COMPACTED EMBANKMENT 43203.000 CUYD 303107 AGGR.BASE COURSE(CLASS 7)1477.000 TON 401011 TACK COAT 901.000 GAL 406151 M.A. ACHM BINDER(1")3495.000 TON 406312 A.B.(PG70-22)ACHM BINDER(1")157.000 TON 407152 MA IN ACHM SURFACE(1/2")1003.000 TON 407352 AB(PG76-22)ACHM SURF(1/2")54.000 TON 412001 COLD MILLING ASPHALT PVMT. 500.000 SQYD 414001 ASPH.CONC.PATCH-MAINT. 5.000 TON 602001 FURNISHING FIELD OFFICE 1.000 EACH 603011 MAINTENANCE OF TRAFFIC 1.000 L.S. 604003 SIGNS 588.000 SQFT 604013 BARRICADES 40.000 LF 604023 TRAFFIC DRUMS 36.000 EACH 604031 FURN.&INSTL.PRCST.CONC.BARR. 2117.000 LF 604036 RELO.PRECAST CONCRETE BARRIER 553.000 LF 604041 CONST.PAVEMENT MARKINGS 18500.000 LF 604055 REMOVAL CONST.PVMT.MARK. 1750.000 LF 604061 REMOVAL PERM.PVMT.MARK. 4250.000 LF 604072 PORT.CHANGEABLE MESSAGE SIGN 30.000 DAY 604083 VERTICAL PANELS 24.000 EACH 605002 CONC.DITCH PAVING(TYPE B)206.000 SQYD 606020 18" R.C.PIPE CULVERTS(CL.3)38.000 LF 606803 18" FES RC PIPE CLVT. 4.000 EACH 606990 SELECTED PIPE BEDDING 25.000 CUYD 606992 SELECTED PIPE BACKFILL 75.000 CUYD 609034 DROP INLETS(TYPE MO)4.000 EACH 609301 DROP INLET EXTENSIONS(4')4.000 EACH 611004 4" PIPE UNDERDRAINS 400.000 LF 620001 LIME 2.000 TON 620011 SEEDING 0.810 ACRE 620021 MULCH COVER 1.620 ACRE 620030 WATER 102.000 MGAL 621001 TEMPORARY SEEDIN 0.810 ACRE 621021 SILT FENCE 1000.000 LF 621031 SAND BAG DITCH CHECKS 300.000 BAG 621051 DROP INLET SILT FENCE 100.000 LF 621071 SEDIMENT BASIN 50.000 CUYD 621101 OBLITERATION OF SED. BASIN 50.000 CUYD 621111 SEDIMENT REMOVAL&DISPOSAL 100.000 CUYD 623001 SECOND SEEDING APPLICATION 0.810 ACRE 624001 SOLID SODDING 226.000 SQYD 626003 EROSION CONTROL MATTING-3 200.000 SQYD 633001 CONCRETE WALK 255.000 SQYD 634201 CC CURB&GUTTER-A(1'6")813.000 LF 635001 RDWY.CONSTRUCTION CONTROL 1.000 L.S. 636001 BRIDGE CONSTRUCTION CONTROL 1.000 L.S.