Road Project Case Study in Arizona

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of road projects in Arizona are also available.

Project Overview

Project Title:AZDOT BOWIE JUNCTION-SAFFORD HWY (US 191
Estimated Value:$9,538,730
The cost to build roads in Arizona depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Arizona
County:Graham
City:Bowie
Address:Ten Ranch To Owl Canyon (Segment III)

Project Type

Building Category:Roads
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Electrical Work, Sewage Piping The proposed work is located in Graham County on US 191, approximately 27 miles south of Safford. The project begins at MP 94.34 and extends north for an approximate length of 3.52 miles. The work includes construction of two northbound lanes east of the existing roadway and milling & AC replacement of the existing southbound pavement followed by an AR-ACFC overlay, turnout drainage improvements and other associated work. Drainage improvements involve construction of a new box culvert, extension of nine concrete box culverts, installation of 32 new pipes, extensions of 15 pipes, and relocate one pipe.