CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Texas construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$57,257,929,934
Bid Phase:$913,042,475
Post-Bid:$246,523,390,435
Civil Projects (value)
Pre-Bid Phase:$13,995,865,814
Bid Phase:$564,633,054
Post-Bid:$87,800,928,322



Railroad Project Case Study in Texas

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of railroad projects in Texas are also available.

Project Overview

Project Title:TXDOT US 277 RAILROAD
Estimated Value:$18,900,500
The cost to build electrical work in Texas depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Texas
County:Maverick
City:Eagle Pass
Address:US 277

Project Type

Building Category:Electrical Work, Pavement Markers, Railroads
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Railroads, Electrical Work, Pavement Markers 100 2002 001 PREPARING ROW STA 39.000 104 2009 REMOVING CONC (RIPRAP) SY 175.00 104 2015 REMOVING CONC (SIDEWALKS) SY 149.000 104 2019 REMOVING CONC (OTHER APPURTENANCES) SY 137.000 104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF 5,858.000 104 2031 REMOVING CONC (HEADWALL) CY .500 105 2016 REMOVING STAB BASE & ASPH PAV(16") SY 27,081.000 110 2001 EXCAVATION (ROADWAY) CY 6,893.000 132 2004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 42,280.000 164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY 27,976.000 164 2041 DRILL SEEDING (TEMP) (WARM) SY 27,976.000 168 2001 VEGETATIVE WATERING MG 121.400 216 2001 PROOF ROLLING HR 11.000 247 2041 020 FL BS (CMP IN PLC)(TY A GR 1)(FNAL POS) CY 9,461.000 340 2050 D-GR HMA(METH) TY-C PG70-22 TON 2,618.000 340 2064 D-GR HMA(METH) TY-C SAC-B PG76-22 TON 8,219.000 360 2004 003 CONC PVMT (CONT REINF-CRCP)(11") SY 11,551.000 368 2002 ANCHOR LUGS PAVEMENT TERMINALS LF 90.000 400 2005 CEM STABI BKFL CY 1,174.000 400 2006 CUT & RESTORING PAV SY 272.000 402 2001 TRENCH EXCAVATION PROTECTION LF 1,642.000 403 2001 TEMPORARY SPL SHORING SF 3,147.000 416 2002 001 DRILL SHAFT (24 IN) LF 67.000 416 2003 001 DRILL SHAFT (30 IN) LF 700.000 416 2004 001 DRILL SHAFT (36 IN) LF 2,432.000 416 2029 001 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 100.000 416 2031 001 DRILL SHAFT (TRF SIG POLE) (30 IN) LF 10.300 416 2032 001 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 36.000