Prison Project Case Study in Florida

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of prison projects in Florida are also available.

Project Overview

Project Title:BREVARD CO DETENTION CENTER PHASE 2
Estimated Value:$6,447,000
The cost to build prisons in Florida depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Florida
County:Brevard
City:Sharpes
Address:860 Camp Rd

Project Type

Building Category:Prisons, Hospitals
Work Type:New

Project Description:

Prison Activity, Administrative , Cells, Dining, Equipment Bay, Equipment Storage, Hospital, Infirmary, Inmate Intake/Outtake Area, Restroom, Security, Shower, Sleep Concrete Slab On Grade Foundation, Other Foundation, Concrete Tilt-Up Structural Frame, Metal Deck Roof Structure, Metal Roof Deck, Built Up Roof, Concrete Tile Roof, Single Ply Roof, Chilled Water Cooling System, Steam/Hot Water Heating System Foundation=Spread Footings/4" Slabs Mechanical=Boiler/Chiller/Vav Units Construction project Will Consist Of Three Phases; The First Phase Will Include Site Work, Detention Fencing, Utility Yard, 4,000 Square Foot Laundry Facility, Slab And Build Out Of Four (4) 10,750 Square Foot Sprung Tent Structures (Tents To Be Supplied And Installed By Brevard County); (Construction Underway) Second Phase=260 Unit Medical/Mental Health Pod; First Fl= 10 Unit Infirmary, 10-2 Man Cells, 18 High Security Cells, 4-60 Unit Dorms, 2nd Floor=Mechanical Rooms, Control Booth,