CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Illinois construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$37,206,289,937
Bid Phase:$363,384,660
Post-Bid:$88,028,209,476
Civil Projects (value)
Pre-Bid Phase:$7,728,134,605
Bid Phase:$75,964,996
Post-Bid:$34,921,454,367



Police Station Project Case Study in Illinois

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of police station projects in Illinois are also available.

Project Overview

Project Title:ROCK ISLAND ARSENAL FIRE/POLICE COMPLEX
Estimated Value:$5,000,000
The cost to build fire stations in Illinois depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Illinois
County:Rock Island
City:Rock Island
Address:Rock Island Arsenal

Project Type

Building Category:Fire Stations, Police Stations
Work Type:New

Project Description:

Fire Station, Police Station Construction Of A 19,672 To 24,125 Gross Square Foot Combined Fire & Police Complex, By Renovating An Existing Historic Facility & Constructing An Addition Construction Will Be Compatible With The Installation Designation As A National Historic Landmark, Renovation Of The Existing Facility & Design & Construction Of The Addition Will Include, But Not Be Limited To The Following: Vehicle Bays For Fire & Emergency Response Vehicles, Overhead Vehicle Exhaust System With Automatic Disconnect, A Central Fire Alarm System For The Installation & A Central Dispatch Center For Fire & Police, Kitchen Facilities, Restrooms, Sleeping Quarters, Exercise Room, Administrative Space, Arms Room, Training Roo & Emergency Operations Center, Exterior Lighting, Paving, Walks, Curbs, Parking Area & Landscaping, Option 1- Install Concrete Pavement; Option 2- Install Bric Pavers; Option 3- Install Hydronic Snow Melt System; Option 4- Add 2,200 SF To New Facility; Option 5- Add 2,200 SF To New Facility; Option 6- Re-Roof Buildin 225; Option 7- Rehabilitate 1st Floor Of Building 225; Option 8- Rehabilitate 2nd Floor Of Building 225; Option 9- Conference Room A/V Equipment; Option 10- Store & Install Furniture