Pavement Marker Project Case Study in Pennsylvania

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of pavement marker projects in Pennsylvania are also available.

Project Overview

Project Title:PADOT SR 219 RUMBLE STRIPS
Start Date:2009-08-01
Estimated Value:$1,336,220
The cost to build pavement markers in Pennsylvania depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Pennsylvania
County:Somerset
Address:SR 219 Section CER

Project Type

Building Category:Pavement Markers
Work Type:New

Project Description:

Pavement Markers This project consists of installing a total of 105.5 miles of milled centerline rumble strips(CLRS)and 329.3 miles of milled edgeline rumble strips(ERS)on various SR’s throughout PennDOT Engineering District 9-0. In addition,this project includes the upgrading of existing shoulders left&right(as well as the corresponding installation of milled edgeline rumble strips)in Somerset County along SR 0219 from Seg. 380/0500 to Seg. 490/2100(from Berlin Borough to the beginning of the concrete 4-lane section of SR 0219). Also included in this contract is the re-painting of all affected edge-and centerlines. In Bedford County,a total of 17.5 miles of milled CLRS will be installed on 5 different SR’s(26,31,220,1044,&4009)while a total of 99.4 linear miles of milled ERS will be installed on 5 different SR’s(30,31,220,1044,&4009). In Blair County,15.7 miles of milled CLRS will be installed on 3 different SR’s(866,3013,&4015)while 27.2 linear miles of milled ERS will be installed on 3 different SR’s(22,1001,&3013). In Cambria County,1.8 miles of milled CLRS will be installed on one SR(3029)and 31.4 linear miles of milled ERS will be installed on 3 different SR’s(36,271,&3033). No milled CLRS will be installed in Fulton County under this project,a total of 28.5 linear miles of milled ERS will be cut on 3 different SR’s(16,30,&522). In Huntingdon County,a total of 23.3 miles of milled CLRS will be added on 3 different routes(SR’s 45,655,and 994)as well as a total of 33.6 linear miles of milled ERS being installed on 2 different routes(SR’s 522&994). In Somerset County 47.2 miles of new milled CLRS will be installed on a total of 10 different SR’s(30,31,56,160,219,281,601,985,3029,&3037)while approximately 109.3 miles of new milled ERS will be added to 7 different SR’s(30,31,56,160,219,281,&601).