CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Pennsylvania construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$24,485,577,809
Bid Phase:$675,805,243
Post-Bid:$94,253,398,511
Civil Projects (value)
Pre-Bid Phase:$2,517,637,057
Bid Phase:$333,398,332
Post-Bid:$35,438,855,103



Miscellaneous Military Project Case Study in Pennsylvania

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of miscellaneous military projects in Pennsylvania are also available.

Project Overview

Project Title:PHILADELPHIA NBC FULL SCALE ELECTRIC DRIVE TEST FAC
Estimated Value:$17,875,300
The cost to build miscellaneous military in Pennsylvania depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Pennsylvania
County:Philadelphia
Address:Building 633

Project Type

Building Category:Miscellaneous Military
Work Type:New

Project Description:

Military - Miscellaneous Construction of the Full Scale Electric Drive Test Facility. The project modifies the existing interior of Building #633 to include: construction of test facility, lay down area, concrete foundations, control house, HVAC, lube oil system, cooling water system, high voltage switchgear, ancillary facilities, auxiliary and supporting electrical facilities, fuel and cooling water piping and other electrical and mechanical supporting services to support Full Scale Electric Propulsion System testing. The project will include some demolition of existing structures, installation of electrical utilities including a 30 MVA transformer and two 13.2 KV, 60 MW substations, and special construction features including an interconnecting underground 12-way electrical utility facility (duct bank and cabling). Power sources will be derived from gas turbine generators in the Building #77H complex. Gas turbine generators, steam turbine generators and fuel ! cells in Building #633 and utility feeders will be utilized.