CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Missouri construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$18,186,318,014
Bid Phase:$226,516,085
Post-Bid:$58,818,274,713
Civil Projects (value)
Pre-Bid Phase:$1,422,502,887
Bid Phase:$161,811,503
Post-Bid:$25,027,696,042



Miscellaneous Military Project Case Study in Missouri

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of miscellaneous military projects in Missouri are also available.

Project Overview

Project Title:FORT LEONARD WOOD WMD TRAINING COMPLEX
Estimated Value:$10,000,000
The cost to build miscellaneous military in Missouri depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Missouri
County:Pulaski
City:Fort Leonard Wood
Address:Fort Leonard Wood

Project Type

Building Category:Miscellaneous Military
Work Type:New

Project Description:

Military - Miscellaneous Construction Of A Weapons Of Mass Destruction (WMD) First Responder Training Complex At Fort Leonard Wood, Missouri, Work Includes, But Is Not Limited To: Construction Of A Chemical, Biological, Radiological And Nuclear (CBRN) Trainin Building, Approximately 40,500 SF, Construction Of A Tunnel/Urban Training Area Including A Tunnel Complex Interconnecting Four (4) Buildings, Concrete Hardstand, Drive And Parking, Construction Of An Intermodal Training Area Including A Concrete Hardstand To Receive Intermodal Containers (Containers Are Not In Contract (NIC)), Railroad Track Set On Concrete Hardstand To Receive Two (2) Rail Tanker Cars And One (1) Flat Bed Car (Rail Cars Are NIC), And An Overhead Cover, Approximately 600 SF, Construction Of A Roadway/Tanker Truck Training Area Including A Simulated Street Intersection To Receive Tanker Truck (Truck Is NIC), Construction Of A Cave Complex Training Area Including Two Simulated Cave Structures, A Tunnel Complex Connecting Both Caves, Drive And Parking, Site Work, Including All Site Grading, Roadways, Parking Lots, Landscaping, Seeding/Sodding, Storm Drainage, Walkways, Extending Utilities For Water, Electric And Communications, Site Lighting, And Tree Removal, Design/Build Requirement, Design And Construction Of Four (4) Tunnel/Urban Training Area Buildings: Simulated Post Office, Approximately 2,000 SF, Simulated Two-Story Factory With Basement, Approximately 3,150 SF, Simulated Three-Story Warehouse, Partially Deconstructed, Approximately 3,950 SF, Simulated One-Story Warehouse, Approximately 3,400 SF, CCTV Cameras Throughout The Complex Will Be Installed By Separate Contact Using OPA Funding