CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Massachusetts construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$36,350,010,376
Bid Phase:$294,290,362
Post-Bid:$59,664,639,186
Civil Projects (value)
Pre-Bid Phase:$1,573,122,550
Bid Phase:$231,366,947
Post-Bid:$15,392,053,673



Miscellaneous Military Project Case Study in Massachusetts

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of miscellaneous military projects in Massachusetts are also available.

Project Overview

Project Title:ARMY NAT'L GUARD READINESS CENTER-SUBS
Estimated Value:$19,592,000
The cost to build miscellaneous military in Massachusetts depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Massachusetts
County:Dukes

Project Type

Building Category:Miscellaneous Military
Work Type:New

Project Description:

Military - Miscellaneous Concrete Foundation, Structural Steel Frame, Brick Exterior, Membrane Roofing, Other Mechanical System The project involved the demolition of an existing 30,000 sf Motor Vehicle Storage Building (MVSB), renovation of the existing 7,000 sf Armory Building, construction of a new 2-story 63,000 sf Military Readiness Center, and alterations to the associated paved and unpaved parking areas and internal driveways within the 5.5 acre Massachusetts Army National Guard facility located off Lowell Street (Route 110) in Methuen. The project included the construction of 257 parking spaces (7 1 pervious spaces - military vehicles, 19 1 impervious surface spaces - soldier-owned vehicles, 5 impervious surface spaces - visitors), force protection features, and supporting stormwater management infrastructure. The project's estimated potable water supply needs (12,500 gallons per day (gpd)) and wastewater flows (12,500 gpd) will be served by the Town of Methuen's Water and Sewer Department, respectively.