CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Kansas construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$6,343,484,564
Bid Phase:$116,203,500
Post-Bid:$23,043,314,952
Civil Projects (value)
Pre-Bid Phase:$1,687,275,468
Bid Phase:$118,653,500
Post-Bid:$10,108,179,829



Miscellaneous Military Project Case Study in Kansas

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of miscellaneous military projects in Kansas are also available.

Project Overview

Project Title:FORT RILEY BLDG 6421 COMMUNICATION CTR
Estimated Value:$2,374,000
The cost to build miscellaneous military in Kansas depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Kansas
County:Geary
City:Fort Riley
Address:Custer Hill Building 6421

Project Type

Building Category:Miscellaneous Military
Work Type:New

Project Description:

Military - Miscellaneous Project Includes Constructing A New Custer Hill Communication Center, The Project Includes Demolition Of A 3386 SF Existing Communication Center Building 6240, The New Reinforced Masonry Communication Building Will Be 4,494 Square Feet Of The First Floor And 859 Square Feet For The Vault Under The Building Fo Atonal For 5,353 Square Feet, All Work Needs To Be Accomplished While The Existing Switch Remains In Operation, The New Building Will Include A Switch Room, Battery Room, And Mechanical Room; Enclose The Entrance To The Cable Vault, Operator Workspace, Break And Training Room, Latrine, And Entry Vestibule, Antiterrorism Measures Include An Alarm System, Access Control Syste And Structural Reinforcement, Special Foundations Using Drilled Piers Are Required Because Of The Expansive Soils, Supporting Facilities Include Site Work, Replacement Of Utilities, Storm Drainage And Relocating The Parking Lot A Greater Distance From The Building, Force Protection Supporting Facilities Include Exterior Lighting, An Access Gate For The Exclusion Is, And Vehicle Barrier Beams, Heating Will Be By Self-Contained Gas Fired Units, Self-Containe Units Will Provide Air Conditioning And Humidity Controls