Miscellaneous Military Project Case Study in Alabama

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of miscellaneous military projects in Alabama are also available.

Project Overview

Project Title:FT MCCLELLAN TRAINING SITE READINESS CTR
Estimated Value:$14,510,000
The cost to build miscellaneous military in Alabama depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Alabama
County:Calhoun
City:Anniston
Address:103 Castle Ave

Project Type

Building Category:Miscellaneous Military
Work Type:New

Project Description:

Military - Miscellaneous Storage Concrete Slab On Grade Foundation, Structural Steel Frame, EIFS Exterior , Metal Deck Roof Structure, Standing Seam Metal Roof Construction Of A New Readiness Center Facility. The Site For The New Facility Is Approximately 20.78 Acres And Will Encompass Parking For Both Military And Privately Owned Vehicles In Addition To The Vertical Construction. The Project Is Designed To Meet The Requirements For A Spirit Gold Rating And Includes Both A Bioretention Pond And A Ground Source Geo-Thermal Heating And Cooling System. Vertical Construction Will Consist Of A 94,121 Square Foot Two-Story Readiness Center, A 400 Square Foot Unheated Storage Building, A 600 Square Foot Controlled Storage Building, And A 300 Square Foot Flammable Materials Storage Building. The Readiness C Enter Building Utilizes Both Structural Steel Framing And Load Bearing Concrete Masonry Walls. Structural Elements Include A First Floor Concrete Slab On Grade, A Second Floor Of Light Weight Concrete On Metal Decking, And A Roof Structure Utilizing Metal Roof Decking, Rigid Insulation, And Standing Seam Metal Roofing. The Exterior Walls Are An EIFS System Applied Over Either Metal Stud Framing Or Concrete Masonry Units. The Interior Walls Ar A Combination Of Painted Concrete Masonry Units And Gypsum Bo Ard On Metal Studs. The Interior Finishes Consist Of Standard Office And Warehouse Finishes As Applicable For The Various Facility Functions. The Building Is Designed Unde The 2003 International Building Code And Is Classified As A Type II-B Unprotected Fully Sprinkled Building.