CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of South Carolina construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$12,224,381,530
Bid Phase:$118,163,747
Post-Bid:$30,813,523,364
Civil Projects (value)
Pre-Bid Phase:$606,394,496
Bid Phase:$241,177,500
Post-Bid:$8,479,763,126



Marine Project Case Study in South Carolina

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of marine projects in South Carolina are also available.

Project Overview

Project Title:CHARLESTON FIXED FISHING PIER
Estimated Value:$1,300,000
The cost to build marine in South Carolina depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:South Carolina
County:Charleston

Project Type

Building Category:Marine
Work Type:New

Project Description:

Marine Work Project In-Cludes The Construction Of A New Fixed Fish-Ing Pier, Which Consists Of A 6 Ft. Wide Fixed Walkway That Leads Out To A Fixed Pierhead. The 12' X 30' Fixed Pierhead Will Be Ac-Cessed By A 6' X 140' Walkway. There Will Also Be A Small 4' X 12' Bump-Out Portion On The Fixed Pierhead. The New Fixed Pier & Walkway Will Be Constructed With Aluminum Deck Units. Aluminum Handrails With Com-Posite Top Rail & Bait Shelf Will Be Installed Around The Pierhead & Along Both Side Of The Walkway. Four (4) Accessible Fishing Stations Will Be Incorporated In The Handrail System Around The Fixed Pierhead. 1) A 10' X 12' Roof Structure To Cover A Por-Tion Of The Fixed Pierhead. The Roof Structure Will Be Timber-Framed & Will Have Metal Roof- Ing. 2) 12 Square Prestressed Concrete Piles As An Alternate To The Treated Timber Piles For The Fixed Pier & Walkway.