Junior High School Project Case Study in Florida

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of junior high school projects in Florida are also available.

Project Overview

Project Title:K8 ELEMENTARY & MIDDLE SCHOOL PH 1 & 2
Estimated Value:$31,000,000
The cost to build pre schools in Florida depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Florida
County:St. Lucie
City:Fort Pierce
Address:Jenkins Rd

Project Type

Building Category:Pre Schools, Elementary Schools, Junior High Schools
Work Type:New

Project Description:

Elementary School, Junior High School, Pre-School CMU Block Structural Frame, Split Face CMU Exterior, Steel Joist Roof Structure Steel Bar Joist Roof Deck Construction Of An Elementary/Middle School PHASE 1 - Includes: Surveying, Limited Clearing To Install Silt Fencing And Berms, On-Site Surface Drainage Management And Erosion Control, Complete Site Clearing, Stripping And Grupping, Sub-Grade Preparation, Removal Of Unusable Soils From Site, Importing Of Fill And Placing Fill To Raised Site Grade To Permitted Elevations Including Constructing Compacted Building Pads, Proof Rolling, Construction Of Temporary Rock Roads; Installation Of An (Irrigation) Well That Will Be Used For Temporary Water And Irrigation; Temporary Fencing At Construction Areas; Permanent Fencing And/Or Site Wall Between The Site And The Adjacent Properties PHASE 2 - Includes: Surveying, Site Development, Maintaining Onsite Surface Drainage Management And Erosion Control, Paving, Drainage, Underground Utilities, Fences And Gates, Landscape And Irrigation, Alumninum Walkways, And The Construction Of An Elementary/Middle School Facility Consisting Of Three (3 Two-Story Buildings And Two (2) One-Story Building Including A Chiller Building The Two-Story Buildings Will Include Classrooms And Administration Areas; The One-Story Buildings Will Be An Auderteria Building Including A Basket ball Cour With Bleachers, Locker Rooms And Multi Purpose Areas