Hospital Project Case Study in Nevada

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of hospital projects in Nevada are also available.

Project Overview

Project Title:VA SOUTHERN NEVADA HCS MEDICAL CTR PH 4
Estimated Value:$364,942,000
The cost to build hospitals in Nevada depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Nevada
County:Clark
Address:6900 N Pecos Rd

Project Type

Building Category:Hospitals
Work Type:New

Project Description:

Hospital, Medical Office, Clinics Construction of a New VA Southern Nevada Healthcare System Medical Center, Phase IV North Las Vegas, NV, Construction Of Approximately 790,000 Gross Square Feet (GSF) Medical Center, The Project Site Is Rectangular In Shape With Approximate Dimensions Of 2,400 Feet Northsouth By 2,600 Feet East-West, The Site Has A Limited Slope Of 2% As Measured Along The North-South Direction, The New VASNHS Medical Center Work Includes Primary Components As Follows: (1) 90-Beds Inpatient Care / Mental Health Care Units (2) Ambulatory Care Facilities, (3) Radiology/MRI/Nuclear Medicine, (4) Pharmacy, (5) Laboratories, (6) Diagnostic & Treatment Clinics, (7) Education/Administration, (8) Warehouse, The Seven-Story Building Will Include An Intermediate Mechanical Floor To Feed The Heavy Medical Section Of The New Medical Center, In Addition, All Major Mechanical & Electrical Equipment Intended For Installation In The New Existing Energy Center Will Be Furnished & Installed Under This New VASNHS Medical Center, Phase IV Construction Contract. This Equipment List Includes Boilers, Chillers, Pumps, Generators, Switchgears, Substations, Switches, & Cooling Towers, The New VASNHS Medical Center Is Intended To Be Fully Operational On Full Emergency Power, With Reserve Water Supplies, & Wastewater Storage Capacity For Up To Four Days