CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of California construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$202,631,432,920
Bid Phase:$5,205,384,871
Post-Bid:$384,942,067,110
Civil Projects (value)
Pre-Bid Phase:$19,895,204,396
Bid Phase:$1,751,408,695
Post-Bid:$95,489,603,204



Hatchery Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of hatchery projects in California are also available.

Project Overview

Project Title:CLAY STA&CAMANCHE RAW WATER PUMP PLANTS
Estimated Value:$93,185,000
The cost to build hatcheries in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:San Joaquin
City:Lodi

Project Type

Building Category:Hatcheries, Municipal Water and Wastewater Facilities
Work Type:New

Project Description:

Water Treatment, Water Piping Clay Station Pumping Plant: Construct 100 Million Gallon Per Day (MGC) Reinforced Concrete Pumping Plant Building Approx 46 Ft Wide x 194 Ft Long With Related Piping, Furnish & Install 4 1750 hp Vertical Turbine Pumps & Motors, Construct A Reinforced Concrete Intake Structure On The Existing Folsom South Canal, Provide Site Piping & Valves Including An 84" Diameter ML&CS Suction Header & 72" ML&CS Discharge Header, Provide A 200,000 Gallon, 144" Diameter Underground Steel Surge Tank, Provide A 69kV Transmission Substation With SF6 Main Circuit Breaker, Isolating Switches, Metering Unit, Structures & Load-Tap Changing Power Transformer, Construct An Asphalt Driveway & Parking Areas For The Pumping Plant & Landscaping Around The Pumping Plant Camanche Pumping Plant: Construct 100 Million Gallon Per Day (MGC) Reinforced Concrete Pumping Plant Building Approx 46 Ft Wide x 217 Ft Long With Related Piping, Furnish & Install 4 2000 hp Vertical Turbine Pumps & Motors, Provide Site Piping & Valves Including An 84" Diameter ML&CS Suction Header & 72" ML&CS Discharge Header, Provide A 50,000 Gallon, 144" Diameter Underground Steel Surge Tank, Construct 4 Million Gallon Prestressed Concrete Reservoir With An Aluminum Dome Roof, A Foundation, Valve Structure, Associated Piping, & Instruments, Provide A 230 kV Transmission Substation with 3 SF6 Circuit Breakers In A Ring Bus Arrangement, Isolating Switches, Metering Unit, Instrument Transformers, Structures, & Load-Tap Changing Power Transformer, Construct A 46 Ft x 55 Ft Reinforced Concrete Substation Control Building, Provide A 12.47 kV Indoor Main & Transfer Bus Metal-Clad Switchgear Lineup, Provide A 12.47/7.2 kV 3-Phases, 4-Wire Overhead Distribution Line With OPGW Fiber Optic Neutral From Camanche PP Substation To The Mokelumne Fish Hatchery, Construct An Asphalt Driveway & Parking Areas For The Pumping Plant & Landscaping Around The Pumping Plant, Furnish & Install Approx 20 Miles Fiber-Optic Cable In Conduit Installed By Others Under 3 Contracts For The Installation Of The Folsom South Canal Connection Pipeline Raw Water Piping: In Addition To The Pumping Plant Site Piping Described Above, Provide Approx 3,700 Ft Of 72" ML&DCS Discharge Piping For Clay Station Pumping Plant, Provide Approx 30 Ft Of ML&DCS & 1390 Ft Of 72" ML&CS Piping Near Camanche Pumping Plan Includes Installation Of 72" Closure Spools Between The Piping Covered By This Contract & Piping Installed By Other Contracts At 4 Locations Brandt Flow Splitting Facility: Construct A Flowmeter Vault Structure With 2 54" Lines & 1 42" Line, Each Line Shall Include Valves, Flowmeters & Other Instruments Includes Connections To Th 3 Existing Mokelumne Aqueducts Campo Seco Center: Replace The Existing Bypass Lines On The 3 Mokelumne Aqueducts At Campo Seco Center, Each New Line Will Include A New Control Valve & A New Magnetic Flow Meter Includes Replacement Of The Existing Main Valve Motor Actuators, Perform Related Required Work Located In Sacramento & San Joaquin Counties