CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Minnesota construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$16,457,339,006
Bid Phase:$154,046,390
Post-Bid:$34,077,669,920
Civil Projects (value)
Pre-Bid Phase:$8,497,703,272
Bid Phase:$65,244,500
Post-Bid:$16,354,395,254



Gymnasium Project Case Study in Minnesota

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of gymnasium projects in Minnesota are also available.

Project Overview

Project Title:LIFETIME FITNESS CENTER
Estimated Value:$10,000,000
The cost to build gymnasiums in Minnesota depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Minnesota
County:Dakota
City:Lakeville
Address:185th St & Dodd Blvd

Project Type

Building Category:Gymnasiums, Fitness Centers
Work Type:New

Project Description:

Gym & Athletic Building Activity, Athletic Training, Computer, Dressing/Changing, Gymnasium, Locker Room, Office[s], Restroom, Vehicle Parking, Weight Room [Division 2]:Clearing, Earthwork, Grading, Excavation, Slope Protection & Erosion Control, Paving & Surfacing, Water Systems, Sewerage & Drainage, Irrigation, Landscaping. [Division 3]:Concrete Formwork, Concrete Reinforcement Structural Concrete, Structural Precast Concrete, Architectural Precast Concrete, Tilt-Up Precast Concrete. [Division 4]:Clay Unit Masonry, Concrete Unit Masonry, Stone, Granite, Masonry Restoration & Cleaning. [Division 5]:Structural Steel, Cold Formed Metal Framing, Metal Fabrications, Metal Stairs, Ornamental Metals. [Division 6]:Rough Carpentry, Wood Decking, Finish Carpentry, Custom Casework. [Division 7]:Insulation, Exterior Insulation & Finish Systems, Fireproofing, Firestopping, Membrane Roofing, Skylights. [Division 8]:Metal Doors, Wood Doors, Coiling Doors and Grilles, Sectional Overhead Doors, Traffic Doors, Entrances & Storefronts, Hardware, Glass & Glazing. [Division 9]:Ceiling Suspension Systems, Drywall/Gypsum, Tile, Acoustical Ceilings, Plastic Panels, Wood Flooring, Stone Flooring, Resilient Flooring, Carpet, Painting, Wall Coverings. [Division 10]:Compartments & Cubicles, Louvers & Vents, Lockers, Toilet & Bath Accessories. [Division 11]:Food Service Equipment, Athletic Equipment. [Division 12]:Rugs & Mats. [Division 13]:Swimming Pools. [Division 14]:Elevators. [Division 15]:Mechanical Insulation, Fire Protection Systems, Plumbing Piping, Plumbing Fixtures, Plumbing Equipment, Hydronic Piping, HVAC Pumps, Boilers, Fuel Fired Heaters, Packaged A/C Units, Radiant Heat, Air Handling, Ductwork, Controls & Instrumentation, Testing & Balancing. [Division 16]:Service/Distribution, Interior Lighting, Exterior Lighting, Emergency Lighting, Alarm & Detection Systems, Voice & Data Systems, Television Systems, Electrical Controls.