CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Utah construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$2,741,295,469
Bid Phase:$66,520,345
Post-Bid:$55,421,393,468
Civil Projects (value)
Pre-Bid Phase:$967,705,844
Bid Phase:$28,179,228
Post-Bid:$7,883,773,951



Golf Course Project Case Study in Utah

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of golf course projects in Utah are also available.

Project Overview

Project Title:SPIRO WATER FILTRATION PLANT PH 2
Estimated Value:$1,500,000
The cost to build municipal water and wastewater facilities in Utah depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Utah
County:Summit
City:Park City
Address:1884 Three Kings Dr

Project Type

Building Category:Municipal Water and Wastewater Facilities, Golf Courses
Work Type:New

Project Description:

The Work Includes Construction A New 200,000 Gallon Finished Water Clearwell; Relocating Existing Utilities; Demolishing Existing Carport; Constructing New Carport To Match Existing; Altering Existing Stream; Landscaping In Accordance With Golf Course Requirements; Constructing 30'X17' Building Addition For Storage ( Alternate Bid Item); Modifying Existing Finished Water Wet Well And Piping; Furnishing And Installing Catwalk Around Existing Sludge Tanks And Filter Press, Two New Slide Gates, One New Vertical-In-Line Pump, One New Sodiu Bisulfite Metering Pump, And Two New Sibmersible Pumps In Existing Collection Box. Electrical Work Includes Modifications To The Existing Motor Control Center, New Conduit, Wiring, Field Instruments And Controls For The Proposed Improvements Including Tie-Ins To The Plant's Existing Electrical And SCADA Control Systems.