CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Oklahoma construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$4,987,559,808
Bid Phase:$165,835,823
Post-Bid:$22,783,383,714
Civil Projects (value)
Pre-Bid Phase:$4,241,625,802
Bid Phase:$60,490,000
Post-Bid:$11,414,612,170



Flood Control Project Case Study in Oklahoma

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of flood control projects in Oklahoma are also available.

Project Overview

Project Title:BITTER CREEK FLOODWATER
Estimated Value:$100,000
The cost to build flood control in Oklahoma depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Oklahoma
County:Grady
Address:Site 18

Project Type

Building Category:Flood Control, Excavating & Grading
Work Type:New

Project Description:

Excavating & Grading, Flood Control Constructing A New Floodwater Retarding Structure, Class B Clearing, 4 Acres; Clearing And Grubbing, 6 Acres; Concrete Pier Removal, LS; Pollution Control, LS; Bermudagrass Sprigging, 7 Acres; Wave Berm Vegetation, 500 LF; Hay Mulch, 6 Acres; Mobilization, LS; Excavation Common Foundation, 12,,200 CY; Earthfill, 32,200 CY; Fine Filter Drainfill, 360 CY; Coarse Filter Drainfill, 20 CY; Topsoil, 1,500 SY; Diversion Or Waterway, 500 LF; Class 4000 Concrete, 26.6 CY; Steel Reinforcement, 2,273 LBS; Reinforced Concrete 18 Inch ID Pipe, 240 LF; 6 Inch PVC ID Pipe, 144 LF; 24 Inch Dmax Riprap, 170 CY; 8 Inch Slide Gate, 1 EA; Metal Fabrication, LS; Bronze Monument Plaque, 1 EA; Field Fence, 1,650 LF; Geotextile, 266 SY; And PAM Erosion Control, LS