CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Oklahoma construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$4,987,559,808
Bid Phase:$165,835,823
Post-Bid:$22,783,383,714
Civil Projects (value)
Pre-Bid Phase:$4,241,625,802
Bid Phase:$60,490,000
Post-Bid:$11,414,612,170



Flood Control Project Case Study in Oklahoma

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of flood control projects in Oklahoma are also available.

Project Overview

Project Title:MUSKOGEE & SEQUOYAH EWP
Estimated Value:$50,000
The cost to build flood control in Oklahoma depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Oklahoma
County:Muskogee
City:Muskogee
Address:Muskogee County & Sequoyah County

Project Type

Building Category:Flood Control
Work Type:New

Project Description:

Flood Control The Work Will Consist Of Furnishing And Installing Rock Riprap In Muskogee County And Sequoyah County, Oklahoma, Muskogee County: Mobilization, 1 LS; 18 Inch Riprap Installed, 1,300 Tons; 12 Inch Riprap Installed, 492 Tons; 4 Inch Bedding Installed, 263 Tons; And Hydraulic Excavator With Operator, 20 Hours, Sequoyah County: Mobilization, 1 LS; 36 Inch Riprap Installed, 1,257 Tons; 4 Inch Bedding Installed, 200 Tons; And Hydraulic Excavator With Operator, 20 Hours, All Quantities Are Estimates