CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Arkansas construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$3,353,830,818
Bid Phase:$50,800,868
Post-Bid:$16,862,124,922
Civil Projects (value)
Pre-Bid Phase:$1,011,717,507
Bid Phase:$66,588,000
Post-Bid:$8,684,147,478



Flood Control Project Case Study in Arkansas

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of flood control projects in Arkansas are also available.

Project Overview

Project Title:MISSISSIPPI RIVER STONE DIKE
Estimated Value:$2,471,300
The cost to build flood control in Arkansas depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Arkansas
County:Mississippi
City:Armorel
Address:Lower Bullerton

Project Type

Building Category:Flood Control
Work Type:New

Project Description:

Flood Control Stone Dike Construction In The Mississippi River At Lower Bullerton (Craighead Pt.), Mississippi County, AR, Constructing Three Dikes By Placement Of Graded Stone A, Graded Stone C, & Riprap Paving, Total Tonnage Of This Project Will Be Approximately 150,966 Tons Of Graded Stone A, 2,712 Tons Of Graded Stone C, & 11,287 Tons Of Riprap