CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Arkansas construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$3,353,830,818
Bid Phase:$50,800,868
Post-Bid:$16,862,124,922
Civil Projects (value)
Pre-Bid Phase:$1,011,717,507
Bid Phase:$66,588,000
Post-Bid:$8,684,147,478



Flood Control Project Case Study in Arkansas

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of flood control projects in Arkansas are also available.

Project Overview

Project Title:ARDOT CR 11 BRIDGE CONSTRUCTION
Start Date:2004-09-01
Estimated Value:Not Available (develop your own cost estimate with RSMeans Online)
The cost to build bridges & culverts in Arkansas depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Arkansas
County:Woodruff
Address:CR 11

Project Type

Building Category:Bridges & Culverts, Flood Control
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Miscellaneous Civil, Flood Control 201011 CLEARING 14.000 STA 201111 GRUBBING 14.000 STA 202096 R&D OF PIPE CULVERTS 2.000 EACH 205011 REMV.EXIST.BR.STR.(SITE 1)1.000 L.S. 210201 UNCLASSIFIED EXCAVATION 1142.000 CUYD 210601 COMPACTED EMBANKMENT 17689.000 CUY 303102 AGGR.BASE COURSE(CLASS 2)1879.000 TON 504130 APPROACH GUTTERS(TYPE D)5.600 CUYD 602001 FURNISHING FIELD OFFICE 1.000 EACH 603001 MAINTENANCE OF TRAFFIC 1.000 L.S. 604003 SIGNS 177.000 SQFT 604013 BARRICADES 40.000 LF 606705 30" SIDE DRAIN 92.000 LF 606990 SELECTED PIPE BEDDING 8.000 CUYD 606992 SELECTE PIPE BACKFILL 15.000 CUYD 611004 4" PIPE UNDERDRAINS 100.000 LF 617001 GUARDRAIL(TYPE A)200.000 LF 617101 TERM.ANCHOR POSTS(TYPE 1)4.000 EACH 617331 THRIE BEAM GUARDRAIL TERM. 4.000 EACH 620001 LIME 3.000 TON 620011 SEEDING 1.68 ACRE 620021 MULCH COVER 3.360 ACRE 620030 WATER 362.900 MGAL 621001 TEMPORARY SEEDING 1.680 ACRE 621011 BALED STRAW DITCH CHECKS 69.000 BALE 621021 SILT FENC 632.000 LF 621111 SEDIMENT REMOVAL&DISPOSAL 38.000 CUYD 635001 RDWY.CONSTRUCTIO CONTROL 1.000 L.S. 636001 BRIDGE CONSTRUCTION CONTROL 1.000 L.S. 726001 STANDAR SIGN 12.000 SQFT 729003 CHANNEL POST SIGN SUPPORT-C 4.000 EACH 802111 CLASS S CONCRETE-BRIDGE 39.900 CUYD 802304 31' PRECAST CONC. CURB UNITS 6.000 EACH 802404 31' PRECAST CONC.INTER.UNITS 18.000 EACH 802504 31' PRECAST PARAPET RAIL UNITS 6.000 EACH 803001 CLASS 1 PROTECT.SURF.TREATMENT 7.200 GAL 804001 REINF.STEEL-ROADWAY(GR 60)484.000 LB 804011 REINF.STEEL-BRIDGE(GR 60)3900.000 L 805203 CONC.PILING(18" SQUARE)770.000 LF 805363 TEST PILES(18" SQUARE)120.000 L 812003 BRIDGE NAME PLATE(TYPE C)1.000 EACH 601001 MOBILIZATION 1.000 L.S.