CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Alaska construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$1,579,995,799
Bid Phase:$45,450,000
Post-Bid:$5,972,248,413
Civil Projects (value)
Pre-Bid Phase:$353,527,871
Bid Phase:$111,475,000
Post-Bid:$5,865,253,358



Flood Control Project Case Study in Alaska

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of flood control projects in Alaska are also available.

Project Overview

Project Title:AKDOT JUNEAU CASCADE POINT ROAD
Start Date:2004-12-01
Estimated Value:$500,000
The cost to build bridges & culverts in Alaska depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Alaska
County:Juneau
Address:Juneau Cascade Point Rd

Project Type

Building Category:Bridges & Culverts, Flood Control
Work Type:New

Project Description:

Bridge[s] & Culvert[s], Road[s], Flood Control Work consists of 3.24 miles of new roadway construction through forested lands, from the end of Glacier Highway at milepoint 40.5 to the beach at Cascade Point The work includes 171 stations of composite road construction; construction of an approximately 41-foot long bridge at Cascade Creek; installation of approximately 2,500 feet of culvert pipe of various sizes; supplying and placin erosion control devices as required; and other miscellaneous items of work.