Fire Station Project Case Study in South Carolina

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fire station projects in South Carolina are also available.

Project Overview

Project Title:ALLEN & PITCH LANDING FIRE STATIONS
Estimated Value:$2,261,550
The cost to build fire stations in South Carolina depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:South Carolina
County:Horry

Project Type

Building Category:Fire Stations
Work Type:New

Project Description:

Fire Station The Work For Both Stations Includes pre-engineered steel structures, slab on grade floor & spread footing foundations. The exterior consists of masonry, brick, stucco, & metal siding with prefinished aluminum windows, metal roof, interior CMU & metal stud partitions with gypsum board finish, suspended acoustical & gypsum board ceiling systems, poured epoxy & sheet vinyl flooring & other various finishes. The facility shall be provided with a fire suppression system throughout. Facility will be connected to public water & sewer systems. The work also includes structural, plumbing, fire sprinkler, mechanical, electrical, civil, & landscaping. Allen Fire Station will be a 3 bay 7,583 SF facility & Pitch Landing Fire Station will be a 2 bay 5,710 SF facility.