Fencing Project Case Study in Washington

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in Washington are also available.

Project Overview

Project Title:WADOT MEDIAN CROSSOVER PROTECTION
Estimated Value:$358,267
The cost to build fencing in Washington depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Washington
County:King
City:Auburn
Address:SR 18 MP 6 47 To MP 6 93

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing LUMP SUM MOBILIZATION 1 600 L.F. HIGH VISIBILITY FENCE 2 520 L.F. REMOVING GUARDRAIL 3 1 EACH REMOVING GUARDRAIL ANCHOR 4 LUMP SUM REMOVING MISCELLANEOUS TRAFFIC ITEM 5 20 C.Y. ROADWAY EXCAVATION INCL. HAUL 6 54 TON GRAVEL BORROW INCL. HAUL 7 30 C.Y. EMBANKMENT COMPACTION 8 10 DAY ESC LEAD 9 450 L.F. SILT FENCE 10 4 EACH STRAW BALE 11 120 L.F. WATTLE 12 750 L.F. COMPOST SOCK 13 1000 EST. EROSION/WATER POLLUTION CONTROL 14 900 S.Y. SEEDING AND FERTILIZING BY HAN 15 2010 L.F. BEAM GUARDRAIL TYPE 1 16 70 L.F. BEAM GUARDRAIL TYPE 10 17 5 EACH BEAM GUARDRAIL TRANSITION SECTION TYP1E8 1 1 EACH BEAM GUARDRAIL FLARED TERMINA 19 1 EACH BEAM GUARDRAIL BULL NOSE TERMINAL 20 2 EACH BEAM GUARDRAIL ANCHOR TYP 4 21 15 L.F. PRECAST CONC. BARRIER TYPE 2 22 60 L.F. REMOVING AND RESETTING EXISTING PERMA2N3ENT BARRIER 13600 L.F. HIGH-TENSION CABLE BARRIER 24 LUMP SUM ADDITIONAL HIGH-TENSION CABLE BARRIER2 5COMPONENTS 1 EACH TRUCK-MOUNTED IMPACT ATTENUATOR 26 204 HR OPERATION OF TRUCK-MOUNTED IMPACT ATT2E7NUATOR 5000 EST. REPAIR TRUCK-MOUNTED IMPACT ATTENUATO2R8 70 EACH FLEXIBLE GUIDE POST 29 204 HR SEQUENTIAL ARROW SIGN 30 1 EACH PORTABLE CHANGEABLE MESSAGE SIGN 31 204 HR OPERATION OF PORTABLE CHANGEABLE MESS3A2GE SIGN LUMP SUM OTHER TEMPORARY TRAFFI CONTROL 33 186 HR OTHER TRAFFIC CONTROL LABOR 34 LUMP SUM TRAFFIC CONTROL SUPERVISOR 35 96 S.F. CONSTRUCTION SIGNS CLASS A 36 2000 EST. ROADSIDE CLEANUP 37 5 EST. REIMBURSEMENT FOR THIRD PARTY DAMAGE 38-1 CALC MINOR CHANGE 39 LUMP SUM SPCC PLAN 40